Indian Minerology: Global Mining Engineers Blog; Miners Study Hub. Master open-cast and underground operations, safety rules, machinery tips, quizzes and career guides worldwide. Subscribe for updates! #MiningEngineersBlog, #OpenCastMining, #UndergroundMining, #IndianMinerology, #WorldWideMining, #Mining Engineering Blog | DGMS Preparation | Open Cast Mining
Cost per tonne calculation is one of the most important parameters in opencast mining. It helps mine management to evaluate profitability, control expenses, and improve operational efficiency.
Cost per tonne is the total cost incurred to produce one tonne of coal, ore, or overburden. It includes operating cost, maintenance cost, manpower cost, fuel cost, and overheads.
Cost per Tonne = Total Operating Cost / Total Production (tonnes)
Monthly Operating Cost = ₹3,00,00,000
Monthly Production = 5,00,000 tonnes
Cost per Tonne = 3,00,00,000 / 5,00,000 = ₹600 per tonne
Fuel cost alone can contribute 30–40% of total mining cost. Even a 5% reduction in fuel consumption can save crores annually.
Lower cost per tonne compared to industry average is considered good, but it depends on stripping ratio and mine conditions.
By improving productivity, reducing fuel consumption, and minimizing equipment downtime.
Cost per tonne is the most critical performance indicator of any mine. Regular monitoring and optimization are essential for sustainable and profitable mining operations.